Michelin plants – Valladolid

Imtech executed the HVAC installations for the co-extrusion facility in the Aranda de Duero factory. The plant manufactures different types of polymer-based parts for all vehicles manufactured in the Palencia and Valladolid Renault factories. In this case 5 rooftop heat pumps for an air-air installation were executed. Diffusion was achieved by means of a network of circular conduits and pipes.
Additionally the location of an existing HVAC unit was modified, adapting its piping and conduit installation to the new location. This was included in the plant’s centralised control.