CPD MCI – WORLDCOM – Madrid

MCI-WORLDCOM implemented a major communications centre in Madrid and entrusted all electrical installations to Imtech. Given our client’s needs, the installation design incorporates measures to ensure that the entire installation is properly functioning at all times, both the network supply and the standalone equipment, with particular emphasis on electrical interlock systems.
With a total built surface of 2,900 m², the project was executed in seven months, with an installation design that facilitates future enlargements without the need for downtimes.
The installations executed were: transformer station, generators, UPS systems, installation of main and distribution panels and power and lighting installations.