The project involved the installations required for extending a communications node, including civil works for air conditioning. It was carried out in a very short time due to the client’s use requirements, keeping the rest of the data center running at all times (zero downtime).
A new main distribution board was installed to feed the various PDU switchboards for powering the node’s new racks. Air conditioning was provided with four precision standalone units with a total 362 kW cooling capacity. It is worth noting the unusual connection of the new 8″ water distribution loop to the existing collectors with a hot-tapping system, ensuring that the service to the rest of the facility is never interrupted.