Repsol Headquarters – Madrid

The Repsol Campus (the company’s new corporate headquarters), with a total built surface of 123,000 square metres, is comprised of 4 5-storey buildings used for offices and different employee services plus 2 parking basements. The central space accommodates a large landscaped courtyard. The building’s design has obtained LEED PLATINUM certification. In this project, Imtech was chosen to execute the HVAC, plumbing and sanitation installations, domestic hot water, CO detection and installation control.

It should be emphasised that the HVAC installation was based on air conditioners that impel to a false floor, which acts as a low-speed air-impeller plenum space. The perimeter areas and meeting rooms combat thermal loads with a 4-tube fancoil network installed in a false floor fitted to floor-level air impeller grilles. Additionally, the plumbing and sanitation for the buildings consisted of a network of immersion rainwater sanitation and reuse for irrigation purposes. Imtech also executed the installation of the building’s centralised management system, connected via the building’s Ethernet network with energy control software that monitors the parameters reported in the LEED PLATINUM qualification which the building possesses.