Cepsa awards Imtech the mechanical assembly of piping to increase solvent capacity at its Puente Mayorga plant

16/03/2015

Imtech has been awarded the mechanical assembly of the storage and pumping to the jetty which forms part of the project aimed at increasing solvent capacity at the Cepsa Química facilities in Puente Mayorga (San Roque, Cadiz).

The assembly work includes the supply and assembly of metal structures, the assembly of equipment and the assembly of piping and accessories. The work will be done both inside the Cepsa Química plant as well as at the Cepsa Gibraltar Refinery.

Cepsa has once again placed its trust in Imtech to carry out industrial work on its site in San Roque, Cadiz, where Imtech will be responsible for the mechanical, electrical and instrumentation maintenance of the Guadarranque chemical plant for a five-year period starting from 2013. It is also currently in charge of valve maintenance at the San Roque refinery.

Refinería de Cepsa Cádiz (800x578)